Why we self-perform concrete (and what it saves you)

Apr 9, 2026 · 8 min read · By Justin Jacobs

Most GCs sub their concrete. We pour our own. Here's the case for keeping the slab in-house — and the numbers behind it.

A typical commercial schedule allots three to five weeks for foundation and slab. In our jobs we hit two — sometimes less — because we own the crew, the forms, and the pour day.

Subbed concrete carries hidden costs the line item never shows. A sub schedules around their own backlog, not yours. They protect their margin by upcharging anything that wasn't on the original takeoff. And when the engineer of record kicks back a rebar question, the answer takes two days to come back through three different inboxes.

We can answer in 20 minutes because the foreman is on our payroll.

On a recent 60,000 sqft warehouse addition we saved roughly six weeks on the slab alone, caught a steel discrepancy the EOR had missed, and gave back $84,000 in unspent contingency at closeout.